Resource Type

Journal Article 682

Conference Videos 40

Year

2024 1

2023 34

2022 55

2021 74

2020 30

2019 44

2018 23

2017 47

2016 21

2015 31

2014 23

2013 43

2012 33

2011 42

2010 45

2009 39

2008 31

2007 23

2006 9

2005 8

open ︾

Keywords

construction 28

ecological civilization 17

construction management 15

construction technology 10

system construction 10

Three Gorges Project 9

sustainable development 9

construction industry 7

Sutong Bridge 6

construction project 5

project management 5

BIM 4

Three Gorges Project ship lift 4

ecological civilization construction 4

green construction 4

ship lift 4

suspension bridge 4

tunnel construction 4

Last Planner System 3

open ︾

Search scope:

排序: Display mode:

Multi-objective Risk Model of Optimal River Diversion Standards During Initial Stage Construction for

Hu Zhigen,Liu Quan,He Changhal,Xiao Huanxiong,Zhou Yihong,Fu Zheng,Li Dingkui

Strategic Study of CAE 2001, Volume 3, Issue 8,   Pages 58-63

Abstract:

For a hydropower project, river diversion planning directly decides the dam construction and has aThe relations between selection of diversion standard and investment, construction duration, risk andThis paper systematically analyzes the controlling factors of choosing diversion standard during initialstage construction is established.construction.

Keywords: construction diversion     initial stage of construction diversion     standard of construction diversion     multi-objective    

The South-to-North Water Diversion Project

Office of the South-to-North Water Diversion Project Construction Committee, State Council, PRC

Engineering 2016, Volume 2, Issue 3,   Pages 265-267 doi: 10.1016/J.ENG.2016.03.022

Whole construction process real-time schedule control and visual analysis of the long distance diversion

Hu Lianxing,Tong Dawei,Jiao Kai

Strategic Study of CAE 2011, Volume 13, Issue 12,   Pages 97-102

Abstract:

Long diversion tunnel is often featured by great embedded depth, long, leading to the deviation between formerly construction schedule plan and actual construction scheduleIf the deviation isn't corrected timely, the formerly plan can not guide the actual construction.process real-time schedule control and visual analysis of the long distance diversion tunnel based onThe feasibility study and scientific basis is provided for the real-time control of construction schedule

Keywords: long diversion tunnel     construction schedule     real-time control     visual     simulation    

Brief description of project plan justification during the initial stage for main bridge of Sutong Bridge

Wu Shouchang, Xu Yingmei

Strategic Study of CAE 2009, Volume 11, Issue 3,   Pages 8-13

Abstract: justify;">This article presents the justification and decision-making of the project plan during the initialstage for Sutong Bridge, with emphasis on initial stage for Sutong Bridge with respect to the justification

Keywords: Sutong Bridge     project plan     special research subjects    

The construction design and practice of Three Gorges Project

Wen Yonghong,Xie Xiangrong,Fan Wuyi

Strategic Study of CAE 2011, Volume 13, Issue 7,   Pages 111-116

Abstract: construction scale, high construction intensity and complexity in technology.in 3-stage III and double line five step ship lock,the general arrangement of the project constructionis as follows:construction in 3-stage,navigation with diversion channel and power generation under cofferdamproject.The practice and innovation achievements in river diversion during construction as well as earthrock and concrete construction were presented emphatically.

Keywords: Three Gorges Project     construction     diversion     earth rock     concrete    

Insurance ratemaking method for risk of construction diversion project

Chen Zhiding,Hu Zhigen

Strategic Study of CAE 2011, Volume 13, Issue 4,   Pages 106-112

Abstract:

Based on analyzing risk factors of diversion project, synthetic riskand distribution law of loss were researched on the grounds that foundation pit is submerged after diversioncollective risk model of the total losses about engineering insurance is established on the basis of constructiondiversion project risk.Ultimately, insurance ratemaking method for construction engineering risk and its mathematical expression

Keywords: diversion risk     engineering insurance     insurance premium     non-homogeneous compound Poisson process    

Intelligent construction technology of railway engineering in China

Chunfang LU, Junfei LIU, Yanhong LIU, Yuming LIU

Frontiers of Engineering Management 2019, Volume 6, Issue 4,   Pages 503-516 doi: 10.1007/s42524-019-0073-9

Abstract: Intelligent construction technology has been widely used in the field of railway engineering.This work first analyzes the connotation, function, and characteristics of intelligent construction ofsystem, intelligent Internet-of-Things (IoT) communication system based on mobile interconnection, constructionThe evaluation index system of each stage is provided from the aspects of technology and function.In the future, the ICRE of China’s railway sector will develop toward a higher stage.

Keywords: China railway sector     intelligent construction     railway engineering     informatization     development stage    

Flutter stability and management strategy for the deck of Taizhou Bridge during construction stage

Li Chengcheng,Chen Airong and Ma Rujin

Strategic Study of CAE 2012, Volume 14, Issue 5,   Pages 46-50

Abstract: three-tower suspension bridge was investigated to discover the flutter stability of deck under symmetrical constructionThe assessment of flutter stability during deck construction stage was performed based on analysis of

Keywords: multi tower suspension bridge     construction stage     flutter stability     management strategy    

Methodological Approach on Virtual Simulation for Water Diversion from South to North in Western China

Li Boheng

Strategic Study of CAE 2003, Volume 5, Issue 5,   Pages 19-23

Abstract:

The south-north water project have been listed in the Tenth Five-Year Plan. Recently the east line and middle line in this project have been ready to start working. In order to change the status of lacking water in north of China, this paper discusses the necessity and the feasibility of diverting water from the southwest trunk rivers with the digital earth virtual technique, including the amount of water diverted, the geologic bedrock, the optimum line of diverting water and the impact on entironment.

Keywords: water diversion     virtual     methodology     Western China    

Stress observation of shaft lining wall during construction and initial operation

Wen Dehua

Strategic Study of CAE 2012, Volume 14, Issue 2,   Pages 80-84

Abstract: ="text-align: justify;">For searching the stress and deformation law of blended shaft-lining during constructionand initial operation, sensors were buried in interior and exterior wall of shaft-lining, and automated

Keywords: shaft lining monitoring     thick topsoil     strain     additional force    

A DSS for Management on the Jointly Discharging of Overtopped Cofferdam

Fang Debin,Wang Xianjia,Hu Zhigen

Strategic Study of CAE 2003, Volume 5, Issue 1,   Pages 62-68

Abstract:

Management on the jointly discharging of overtopped cofferdam is a typical semi-structured problem. So a decision support system is designed to address the management on the jointly discharging of overtopped cofferdam. This paper introduces systematically the structural framework, design principle, decisionmaking mode, and fundamental function of CDDSS. The system consists of four components: database subsystem, model base subsystem, graphics base subsystem, method base subsystem, and user-interface. A CDDSS is a man-machine interactive system,which integrates computer science and technology with the theory and method of systems science, management science and the theory and method of hydraulic and electric engineering. The case study illustrates that the friendly window-based user interface of the system enables the decision maker/user to take full advantage of the capabilities of the system in order to make effective real-time decisions.

Keywords: overtopped cofferdam     construction diversion management     decision support system (DSS)    

Effect of mulching with maize straw on water infiltration and soil loss at different initial soil moistures

Yifu ZHANG,Hongwen LI,Jin HE,Qingjie WANG,Ying CHEN,Wanzhi CHEN,Shaochun MA

Frontiers of Agricultural Science and Engineering 2016, Volume 3, Issue 2,   Pages 161-170 doi: 10.15302/J-FASE-2016104

Abstract: study investigated the effect of straw mulching on water infiltration and soil loss under different initialIncreasing initial SWC can decrease soil infiltration and increase soil loss.During an 80 mm rainfall event (80 mm·h for 60 min), 8%, 12% and 16% initial SWC treatments decreased42.5% and 58.1%, and increased total sediment yield by 44, 146 and 315 g, respectively, compared to 4% initialFor all initial SWC treatments, straw mulching of 30% or more significantly enhanced water infiltration

Keywords: infiltration     initial soil water content     rainfall simulation     soil loss     straw mulching    

Water Diversion is Not to Blame for Phosphorus Enrichment in Taihu Lake

Zhiyuan Wang,Qiuwen Chen,Jianyun Zhang,Hanlu Yan,

Engineering doi: 10.1016/j.eng.2023.07.007

Abstract: The Water Diversion Project from the Yangtze River to Taihu Lake (WDYT) has been widely recognized asresponse to the misconception about the source of phosphorus loading, we quantified contribution of water diversionconstructive guidance for water resource management of Taihu Basin and phosphorus load control of the second stage

Evacuation strategies for vertical ship lift during initial fire: Integrated application of stairs and

Shu CHEN, Menghan SHANG, Jianping WANG

Frontiers of Engineering Management 2021, Volume 8, Issue 1,   Pages 135-147 doi: 10.1007/s42524-020-0125-1

Abstract: The proposed model can provide a theoretical reference for evacuation research during initial fire events

Keywords: vertical ship lift     initial fire     fire evacuation     numerical simulation     stair     elevator    

Initial stiffness and moment resistance of reinforced joint with end-plate connection

Sufang WANG, Yiyi CHEN,

Frontiers of Structural and Civil Engineering 2009, Volume 3, Issue 4,   Pages 345-351 doi: 10.1007/s11709-009-0054-x

Abstract: The joint is divided into some basic components, and the initial stiffness of each component is obtainedEspecially, the initial stiffness of reinforced components is drawn by theoretical model and finite elementThe initial stiffness of reinforced joint can be obtained by assembling the initial stiffness of eachcomparison with the results of finite element calculation, it is verified that the method to calculate the initial

Keywords: steel structure     end-plate connection     backing plate     supplementary web plate     initial stiffness     moment resistance    

Title Author Date Type Operation

Multi-objective Risk Model of Optimal River Diversion Standards During Initial Stage Construction for

Hu Zhigen,Liu Quan,He Changhal,Xiao Huanxiong,Zhou Yihong,Fu Zheng,Li Dingkui

Journal Article

The South-to-North Water Diversion Project

Office of the South-to-North Water Diversion Project Construction Committee, State Council, PRC

Journal Article

Whole construction process real-time schedule control and visual analysis of the long distance diversion

Hu Lianxing,Tong Dawei,Jiao Kai

Journal Article

Brief description of project plan justification during the initial stage for main bridge of Sutong Bridge

Wu Shouchang, Xu Yingmei

Journal Article

The construction design and practice of Three Gorges Project

Wen Yonghong,Xie Xiangrong,Fan Wuyi

Journal Article

Insurance ratemaking method for risk of construction diversion project

Chen Zhiding,Hu Zhigen

Journal Article

Intelligent construction technology of railway engineering in China

Chunfang LU, Junfei LIU, Yanhong LIU, Yuming LIU

Journal Article

Flutter stability and management strategy for the deck of Taizhou Bridge during construction stage

Li Chengcheng,Chen Airong and Ma Rujin

Journal Article

Methodological Approach on Virtual Simulation for Water Diversion from South to North in Western China

Li Boheng

Journal Article

Stress observation of shaft lining wall during construction and initial operation

Wen Dehua

Journal Article

A DSS for Management on the Jointly Discharging of Overtopped Cofferdam

Fang Debin,Wang Xianjia,Hu Zhigen

Journal Article

Effect of mulching with maize straw on water infiltration and soil loss at different initial soil moistures

Yifu ZHANG,Hongwen LI,Jin HE,Qingjie WANG,Ying CHEN,Wanzhi CHEN,Shaochun MA

Journal Article

Water Diversion is Not to Blame for Phosphorus Enrichment in Taihu Lake

Zhiyuan Wang,Qiuwen Chen,Jianyun Zhang,Hanlu Yan,

Journal Article

Evacuation strategies for vertical ship lift during initial fire: Integrated application of stairs and

Shu CHEN, Menghan SHANG, Jianping WANG

Journal Article

Initial stiffness and moment resistance of reinforced joint with end-plate connection

Sufang WANG, Yiyi CHEN,

Journal Article